Intro
Cockram Builders required Scaffold at their site in Sunshine but had conditions we had to have platforms to 24m for their cladding works, but we were not able to connect to the building. Further constraints included the Hospital needing an undercover walkthrough access with no disturbances or fixtures, plus we needed to scaffold at a different angle to the building.
Solution
Freestanding scaffolding platforms and 24 hour hospital access.
System
The building industry presents high demands for load-bearing capacity – with Layher modular scaffolding, loads up to 6kN/m² are possible. Heavy duty or higher are easily achieved. With various access solutions from built-in access decks to stair towers and easy walk-through access with no trip hazards, workers and public safety can be assured.